Business Central MRP consultant for manufacturers
A Business Central MRP consultant should know the shop floor as well as the software. We set up bills of materials, routings, work centers and the planning worksheet. So the suggestions Business Central makes are ones your planner would have made. Your cost of goods then comes from real routings, not a guess.
Last updated
A Business Central MRP consultant starts with BOMs and routings
Planning is only as good as the data under it. So we sit with engineering and production. Together we capture production BOMs, phantom and multi-level structures and scrap. We also capture the routing steps each item really goes through, including subcontracted operations.
Versions matter when designs change. We set up BOM and routing versions with starting dates. So an engineering change goes live on the right day. Open orders keep working.
Map your products →
- ✓Production BOMs and versions
- ✓Routings and routing links
- ✓Work centers and machine centers
- ✓Scrap and setup times
- ✓Subcontracted operations
What a Business Central MRP consultant tunes in planning
Business Central calculates a master production schedule and material requirements in the planning worksheet. It uses the reordering policy on each item or stockkeeping unit. Lot-for-lot, fixed reorder quantity, maximum quantity and order each suit different parts. The wrong one floods you with suggestions.
We tune the policies, safety stock, lead times and time buckets item by item with your planner. Then planning runs with your planner until the action messages make sense. Demand forecasts can feed the plan where you sell from stock.
Tune your planning →- ✓Reordering policies per item
- ✓Safety stock and lead times
- ✓Demand forecasts
- ✓Stockkeeping units by location
- ✓Action message cleanup
Capacity you can see before the floor is overloaded
Work center calendars, shifts and efficiency give Business Central what it needs to show load against capacity. Your supervisor can then see which weeks are overbooked. Orders move before a machine becomes a bottleneck.
Some shops need finite scheduling beyond what is standard. For them, we explain the options honestly, including AppSource add-ons. Nothing custom is built that you must maintain forever.
Look at your capacity →
- ✓Shop calendars and shifts
- ✓Work center load
- ✓Machine center efficiency
- ✓Rescheduling of released orders
Production orders from a Business Central MRP consultant
We configure the flow from planned to firm planned to released production orders. We also set how materials are consumed. That can be by hand, by backflushing or through warehouse picks. Output and time post from simple journals or the shop floor screens your operators use.
Item tracking with lot and serial numbers is set up where you need traceability. Then a customer complaint can be traced back to the components and the batch that went into a finished item.
Plan your shop floor flow →- ✓Production order statuses
- ✓Backflushing or manual consumption
- ✓Output and capacity journals
- ✓Lot and serial tracking
- ✓Warehouse picks for production
Standard or actual cost, built from real data
Manufacturing costs come together from material, labor, machine time and overhead. We help you choose standard or actual costing per item. We set cost rates on work centers. Then we run the standard cost worksheet, so rollups reflect current BOMs and routings.
Variances then show where the money went. For many manufacturers, it is the first time they see margin by product with any confidence. That is why a Business Central MRP consultant should treat costing as part of the setup.
Get costing right →
- ✓Costing method per item
- ✓Work center cost rates
- ✓Overhead rates
- ✓Standard cost worksheet
- ✓Variance reporting
Business Central MRP consultant questions
Which Business Central license includes manufacturing?
Manufacturing features are part of the Premium license. These include production orders, routings, capacity and the planning worksheet with MRP. Essentials includes assembly BOMs for simple kitting. Some light assemblers use those instead. We check your needs against the license before we design anything, so you do not buy more than you use.
What does a Business Central MRP consultant set up first?
The item data comes first. That means BOMs, routings, lead times and reordering policies. Planning cannot give good suggestions until that data is right. So we clean it before we switch planning on. A short look at your current records shows what needs fixing. You then agree the order with us.
Can Business Central handle make to order and make to stock?
Yes. Reordering policies and order tracking support both, and many manufacturers run a mix. We set the policy item by item, based on how each one is sold. Then planning treats a made-to-order part differently from a stocked part. You get suggestions that fit each product.
Does a Business Central MRP consultant need an add-on for scheduling?
Many shops do fine with standard capacity planning. Where finite scheduling or detailed floor control is needed, we explain the AppSource options and let you decide. We show each option against your own routings in a sandbox. So you judge it on your data, not on a demo.
Can you connect our shop floor data collection?
Often, yes. Business Central exposes APIs for output and consumption. So barcode scanners and data collection tools can post straight into it. We scope that as part of the integration work. We test it with your operators on a real order before go-live.
Book a discovery call
Let's talk through your move to Business Central.
A focused call with a senior consultant. We learn how your business runs today, give you an honest view on whether Business Central fits, and outline scope and next steps before you commit to anything.
What happens after you send the form